Projects
carried out in task-force:
A full team gathering the various departments on a project: process, equipment,
civil works, piping, HVAC, electricity/instrumentation.

2D
/ 3D method:
A 3D model can be generated thanks to the documents issued by the various
contributors such as:
- PID sketches
- HVAC drawings
- Piping routing
- List of fluids
- List of lines
- Cableways drawings
- Etc.
The CAD design team draws an erection model with the data given by all the
different contractors allowing to integrate the various designs (building, primary
equipment, pipings...) and carry out model reviews to control layouts, routings...

The
application of procedures and quality indicators allows to ensure and improve
the level of efficiency.
|